General presentation
We were involved in the dismantling of the Douala training centre, which was carried out in 2014 by our company, and in the reassembly at a new site. Easycube responded to the challenge of optimising the construction phase and reusing a maximum number of elements and parts to minimise the costs of this transfer.
Technical presentation
The training centre is designed with a thin-core metal structure covered with an insulated roof, inside which is installed an space made of Dreyer insulated panels. The supply of electrical equipment, air-conditioning system and computer network were also brought back into operation at the new site by our assembly teams.
Key figures
- Surface: 160 sqm
- On-site installation: 1 week of dismantling + 2 weeks of assembly